Design leaders across manufacturing, energy, and process industries share a new common concern: Thousands of legacy 2D drawings sit in flat files while shutdown dates and Start of Production (SOP) windows approach fast. When a senior designer retires, much of the tribal knowledge retires as well. Executives are left asking how to protect schedule, cost, and compliance without the original subject-matter experts.
Katalyst Engineering recognizes this pressure. During the last 15 years, we have modernized more than 42 million square feet of industrial space, converting over 120,000 sheets from CAD to BIM with a documented 98.7% first-pass accuracy. Our co-working team blends plant engineering, ECU development, and Design for Manufacturing (DFM) expertise, so clients gain a partner-not a vendor-for digital transformation initiatives.
Moving from 2D CAD to intelligent 3D Building Information Modeling (BIM) does more than create attractive visuals. It connects data, teams, and timelines. For capital project owners, that translates to faster decisions and fewer late-stage changes.
Katalyst Engineering approaches every conversion as a joint mission. We collaborate with plant managers, facility engineers, and BIM/VDC leads through an integrated communication cadence.
The table below summarizes how different Levels of Development support specific industrial use cases.
LOD Level | Typical Use Case | Key Attributes Included | Resulting Benefit |
200 | Concept planning | Overall geometry, massing, and basic systems | Early clash detection, budgetary takeoffs |
300 | Detailed design | Precise dimensions, manufacturer-neutral families | Final coordination before fabrication |
350 | Fabrication intent | Connection details, install clearances | Accurate shop drawings and prefabrication |
400 | As-built & FM | Serial numbers, spare parts, maintenance data | Direct CMMS upload, long-term asset tracking |
By aligning each project with the minimum viable LOD, we apply value engineering principles that prevent unnecessary modeling effort while meeting operational goals.
Industrial facilities operate under razor-thin margins. Our conversion methodology reduces total installed cost in three measurable ways:
Pro Tip: Documented studies show that every unresolved clash can add USD 3,900 to field labor. Early BIM coordination routinely eliminates 85 to 90% of clashes before mobilization.
We support DWG, DXF, DGN, PDF, TIFF scans, and point clouds. Multi-discipline sheets for architecture, structure, MEP, and process are all within scope.
Our three-tier QA program holds geometry tolerance to ±3 mm for steel and ±5 mm for MEP. Digital checklists record every review cycle for audit confidence.
A 1,000-sheet brownfield plant averages six to eight weeks from kickoff to model sign-off, depending on LOD and on-site access for verification.
Balancing compliance, schedule, and cost in today’s industrial projects is challenging, but you do not have to navigate it alone. Katalyst Engineering offers a complimentary 30-minute CAD-to-BIM readiness assessment. During the session, we will review two sample drawings, map the required LOD to your BEP, and draft a phased, turnkey delivery plan aligned to your upcoming SOP.